Ubungo Tanzania Emergency Gas Turbine Power Plant

CHA was appointed as owner's engineer/advisor for the fast track procurement and installation of a power plant consisting of two new GE LM6000 gas turbine generators to supply power to the Tanzania power grid.

Project Services:
  • Preparation of technical sections of the turnkey bid specifications and technical assistance in bid selection
  • Determination of high voltage utility interconnection and protection requirements
  • Preparation of preliminary site layout drawings
  • Review and evaluation of turnkey bids
  • Reviews during contract stage of the contractor's documentation including piping and instrument diagrams and general arrangement drawings
  • Review of performance test procedures and provision of independent assessment of test performance results