SUNY at Cortland, Lusk Field House Renovations
CHA developed a renovation program for this 54,000-square-foot field house facility originally constructed in the 1960s. The renovations included installation of a new athletic flooring surface, a new netting system and lighting. Translucent window systems were installed in the end walls and skylights in the roof system to allow for more natural light in the facility and acoustic panels were installed to the underside of wood roof deck to improve acoustics. The attached locker room facility was completely renovated including upgraded locker rooms and toilet rooms, and the addition of an athletic training room.