Ocean Avenue Multimodal Improvements

We prepared design plans for this fast-tracked roadway reconstruction project of Ocean Avenue in New London. The project was funded under the Local Transportation Capital Improvement Program (LOTCIP) and our team delivered the design plans within 3 months of the contract signing to meet program requirements.

Our team saved the city over $100,000 by performing a FHWA Manual on Uniform Traffic Control Devices (MUTCD) signal warrant analysis that revealed replacement of traffic signals was not necessary, as originally scoped.

Project Services:
  • Highway Design
    • Traffic Analysis
  • Water Resources
    • Drainage Improvement
    • Permitting Assistance
  • Land Surveying
  • Construction Services
Ingenuity:
  • Soil additives to improve compaction and service life
  • Traffic review to reduce unneeded upgrades