Ocean Avenue Multimodal Improvements
We prepared design plans for this fast-tracked roadway reconstruction project of Ocean Avenue in New London. The project was funded under the Local Transportation Capital Improvement Program (LOTCIP) and our team delivered the design plans within 3 months of the contract signing to meet program requirements.
Our team saved the city over $100,000 by performing a FHWA Manual on Uniform Traffic Control Devices (MUTCD) signal warrant analysis that revealed replacement of traffic signals was not necessary, as originally scoped.
Project Services:
- Highway Design
- Traffic Analysis
- Water Resources
- Drainage Improvement
- Permitting Assistance
- Land Surveying
- Construction Services
Ingenuity:
- Soil additives to improve compaction and service life
- Traffic review to reduce unneeded upgrades