Lycoming University, Lamade Natatorium Conditions Assessment

CHA recently conducted a visual inspection of Lycoming College’s Lamade Natatorium to assess the facility’s conditions and provide recommendations for its improvement. The audit analyzed the swimming pool and associated equipment, assessed their deterioration/end of life, observed compliance with the Pennsylvania Health Department code and nationally recognized swimming pool code (MAHC), evaluated life safety and ADA requirements, and recorded observations and recommendations for the natatorium and mechanical room.

Various improvements to the pool and natatorium were identified and presented in a report, which included an itemized probable construction cost estimate. Subsequently, this report is anticipated to be used to establish the scope of repair construction documents.