Kirkland Lake Power Plant Wood Boiler Superheater Addition

The three wood-fired boilers at Kirkland Lake Generating Station were designed and supplied by Deltak. The combustors for the wood-fired boilers were designed and supplied by KMW.

CHA provided engineering services for the boiler design modifications to add the superheaters to the three wood-fired boilers.

Project Services:
  • Preparation of cost estimate
  • Performance calculations
  • Preparation of equipment specifications and procurement of long lead equipment
  • Review of vendor, B&W and equipment modification proposals
  • Design and preparation of construction documents