Kimberly-Clark Terrace Bay 20 MW Steam Turbine Generator Installation

In a joint venture, CHA and V.B. Cook Co. Limited were the engineers for the design and installation of a 20 MW load displacing backpressure steam turbine generator in a new building adjacent to the existing Number 4 Power Boiler building. The turbine generator supplies the mill low pressure steam system while offsetting purchased electricity.

Project Services:
  • Steam turbine generator contract coordination
  • Steam piping design and layout
  • Turbine hall layout
  • High voltage system modifications and coordination with the utility for interconnection
  • Boilerhouse steam control system modifications