Kimberly-Clark Terrace Bay 20 MW Steam Turbine Generator Installation
In a joint venture, CHA and V.B. Cook Co. Limited were the engineers for the design and installation of a 20 MW load displacing backpressure steam turbine generator in a new building adjacent to the existing Number 4 Power Boiler building. The turbine generator supplies the mill low pressure steam system while offsetting purchased electricity.
Project Services:
- Steam turbine generator contract coordination
- Steam piping design and layout
- Turbine hall layout
- High voltage system modifications and coordination with the utility for interconnection
- Boilerhouse steam control system modifications