Ford Windsor 28 MW Steam Turbine Generator Installation
CHA provided detailed engineering, design and procurement services for the installation of a 28.5 MW extraction condensing steam turbine generator in the existing powerhouse of the Ford Motor Company Plant. The unit was mounted on a modified existing foundation and an existing condenser was refurbished to serve the new unit. The project was carried out in a joint venture with the installing contractor.
Project Services:
- Contract coordination for the following
- Steam turbine generator procurement and installation
- Auxiliary systems and equipment procurement and installation
- Modification of existing turbine generator foundation to suit new unit
- Engineering for the refurbishment of the existing steam condenser
- Design of the following
- Piping systems
- High and medium voltage electrical systems
- Electrical systems protection
- Data acquisition system