East Windsor Cogeneration LP

CHA provided project front-end engineering design (FEED) and development assistance and served as the owner’s engineer throughout the construction of this 84 MW cogeneration system. The project included LM6000PD Sprints and dual-pressure OTSGs feeding the Ford-Windsor engine plant. CHA continued to provide engineering support after construction.

Project Services:
  • FEED and development assistance
  • Owner's engineer
  • Post-construction engineering support