Doug Shaw Stadium
CHA prepared a plan for reconstruction of Doug Shaw Stadium. The facility reconstruction included a new eight-lane collegiate track facility, new synthetic turf football/soccer field, new sports lighting, an additional 1,000 seats, ADA and structural improvements to the existing 4,000 seats, and upgrades to the existing press box facility.
In addition, CHA provided design, permitting and construction administration services for stadium upgrades, including demolition of existing support structures, construction of two new team rooms, an officials locker room, and a 3,000-square-foot restroom facility. Renovations to the grandstand included structural repairs, two new aisles and the addition of 1,000 seats. CHA also designed renovations to the existing track including resurfacing and the addition of two new sprint chutes, as well as the replacement of the synthetic turf field within.