Denison University, Piper Stadium
CHA performed design/build services for the turnkey design and renovation of Piper Stadium, including the Deeds Field and Track facility located in the middle of the Denison campus. The new Piper Stadium is a first class athletic facility servicing the Division III student athletes and intramural program at Denison as well as outside group use. The facility features:
- New synthetic infill turf field replacing the original natural turf football field
- Site fencing and brick walls surrounding the field
- New 400-meter rubberized all-weather NCAA track
- New sports lighting
- 1,200 SF track storage facility
- 800 SF restroom/concession building
The CHA team’s program included all site permitting, storm water management, athletic sports field and track work, common areas for spectators, landscaping, site and field lighting, utility upgrades to support the new facility, and new concrete sidewalks.