CRUSA Water Production Facility and System Improvements

As part of the Water Use Permit (WUP) renewal through the Southwest Florida Water Management District (SWFWMD), Polk County proposed a consolidation of their five water production facilities into one regional water production facility capable of treating 4-mgd on a maximum daily basis to supply customers within the CRUSA. This regional water production facility incorporates advanced water treatment technologies to ensure continued delivery of high quality and regulatory compliant potable water. An analysis of the feasibility of installing an upper Floridan Aquifer (UFA) and a lower Floridan Aquifer (LFA) potable water production well to allow for cooperative funding through SWFWMD was conducted.

The plant’s design included two emergency power generators, high service pumping, and granular activated carbon (GAC) units with redundant facilities to meet projected demands and increase safety. The design accelerated the ozonation specifications to allow for early purchase of the ozone equipment to save the County from paying state sales tax and allow for efficiencies during construction. The GAC system was designed to allow a flow rate adjustment so a portion of ozonated water can bypass the GAC and blend directly with GAC water to meet strict water quality limits without undo cost. CHA reviewed, revised, and completed the calibration of the CRUSA potable water hydraulic model. Services included preliminary design, final design, permitting, bidding, construction phase and start-up.

The completed facility includes three Upper Floridan Aquifer raw water wells, LOX storage and feed systems, ozone generation, side stream ozone injection system, ozone dissipation chambers, transfer pumping, GAC units, chlorine feed systems, corrosion inhibitor, 1-MG ground storage reservoir and high service pumping. The wells are outfitted with vertical turbine pumps and emergency power with engine generators. The high service pumping station is equipped with horizontal, split case centrifugal pumps with variable frequency drives and has a capacity of 8-mgd. The project was delivered via CMAR delivery method.

Project Services:
  • Pilot Study
  • Advanced Water Treatment Technologies
  • Regulatory Compliance
  • Regional Water Supply