Cornell Central Heating Plant Steam Boilers Addition

Steam Boiler AdditionThe Cornell University Central Heating Plant was upgraded and expanded by the installation of two 110,000 lb/hr, 400 psig, 600°F superheated steam boilers burning natural gas or No. 6 fuel oil to replace two existing boilers. The project also included one boiler feed pump, steam pressure reducing/desuperheating system, extensive boilerhouse building modifications, expansion and upgrading of the distributed control system.

Project Services:
  • Preparation of main equipment bid specifications, bid reviews, and procurement recommendations
  • Detailed engineering and designs for all installation/modification work
    • Architectural
    • Civil
    • Mechanical
    • Electrical
    • Instrumentation and controls
  • Preparation of installation contract specifications
  • Monitoring of site installation work and commissioning
  • Review of all vendor drawings and documents
  • Engineering and design to support the environmental assessments and permitting applications prepared by associated New York environmental consultant