Chalk River Laboratories District Heating Plant Upgrade
CHA acted as owner's engineer for the demolition of portions of the steam plant as well as the addition of one 40,000 lb/hr boiler and one 80,000 lb/hr boiler. We completed the design of a natural gas line suitable for installation at the nuclear facility.
Project Services:
- Conceptual design and technical specifications for plant upgrade design-build project
- Conceptual and detail design for various plant upgrades
- Ongoing technical support for installation contracts