ALB Runway 19 Extension

This project involved the northward extension of the primary runway and parallel taxiway at Albany International Airport. Improvements included a new 6,000-foot perimeter road, utility line relocations, and FAA navaid relocation and replacement. Shaker Creek was also routed through a culvert system designed to withstand aircraft loading. Additionally, an extensive construction phasing and sequencing plan was developed to avoid impacts to operations.

Project Services:
  • Obstruction Analysis
  • Wetland Mitigation
  • Construction Inspection and Administration
  • Pavement, Drainage, Lighting and Marking Design