ALB Runway 19 Extension
This project involved the northward extension of the primary runway and parallel taxiway at Albany International Airport. Improvements included a new 6,000-foot perimeter road, utility line relocations, and FAA navaid relocation and replacement. Shaker Creek was also routed through a culvert system designed to withstand aircraft loading. Additionally, an extensive construction phasing and sequencing plan was developed to avoid impacts to operations.
Project Services:
- Obstruction Analysis
- Wetland Mitigation
- Construction Inspection and Administration
- Pavement, Drainage, Lighting and Marking Design