40 MVA, 115 kV/13.8 kV Substation, Kirkland Lake Peaker Plant

CHA designed a new 115 kV/13.8 kV substation required for a 35 MW peaking gas turbine facility. Our responsibilities included the design and installation of protective relaying, ground grid, 13.8 kV switchgear, 115 kV/13.8 kV transformer, DC battery systems, HV breaker, HV disconnect, and HV line extension.

Our Services:
  • Detailed design: civil, structural and electrical
  • Electrical equipment specifications
  • Protection design