40 MVA, 115 kV/13.8 kV Substation, Kirkland Lake Peaker Plant
CHA designed a new 115 kV/13.8 kV substation required for a 35 MW peaking gas turbine facility. Our responsibilities included the design and installation of protective relaying, ground grid, 13.8 kV switchgear, 115 kV/13.8 kV transformer, DC battery systems, HV breaker, HV disconnect, and HV line extension.
Our Services:
- Detailed design: civil, structural and electrical
- Electrical equipment specifications
- Protection design